Skip to content

Turnkey · creel to cut-off

A complete pultrusion line, from layout drawing to the first good profile.

A turnkey pultrusion line covers every station between the roving creel and the cut-off saw, plus the dies, acceptance testing, installation and training that make it produce. Henan Zhongsheng designs and builds the line; the Shanghai export office contracts, ships and coordinates after-sales.

Pultrusion production line layout in the factory

Stations

Six stations, one quotation

  1. 01

    Creel

    Roving racks for direct roving packages; mat and veil stands.

  2. 02

    Impregnation

    Open resin bath or closed injection box with metering.

  3. 03

    Preforming

    Guide plates that place fiber and mat before the die.

  4. 04

    Die and heating

    Chrome-plated steel die on a heated, adjustable die table.

  5. 05

    Puller

    Hydraulic reciprocating clamps or caterpillar tracks.

  6. 06

    Cut-off

    Synchronized saw; optional stacking and packing.

Project phases

Who does what, in order

  1. 01

    Line design

    Engineering

    Profiles, output and floor plan turned into a line configuration and layout drawing.

  2. 02

    Manufacture

    Factory

    Machines and dies built in Xinxiang; die trials on the factory's own line.

  3. 03

    Factory acceptance test

    Buyer + factory

    Line run against written pass/fail criteria, witnessed by you or your inspector.

  4. 04

    Shipping and site preparation

    Buyer

    Foundation, power, compressed air and exhaust prepared to the layout drawing.

  5. 05

    Installation and SAT

    Factory engineers

    Supervised installation and site acceptance on your profile.

  6. 06

    Training and handover

    Factory engineers

    Operators and a process technician trained; spare-parts kit handed over.

Scope

Included and quoted separately

Included in a turnkey quotation

  • Line design and layout drawing
  • Pultrusion machine(s) with control and cut-off
  • Dies for the agreed launch profiles
  • Creels, resin bath or injection system, preformers
  • FAT with written pass/fail criteria
  • Installation supervision and commissioning
  • Operator and process-technician training
  • Standard spare-parts kit

Quoted separately or by the buyer

  • Building, foundations, utilities
  • Raw materials
  • Destination-standard electrical certification
  • EU authorized representative, if required
  • Freight, insurance, import duties
  • Product qualification testing
  • Additional dies after launch

Read before you commit

Guides for new plants

FAQ

Turnkey line questions

What does turnkey include?
Line design, machines, dies for the agreed profiles, creel and resin system, FAT, installation supervision, commissioning on your profile and training. The exact list is on the quotation, with anything excluded stated explicitly.
Do you supply raw materials or formulations?
The factory can recommend resin and fiber specifications and share its starting process parameters for comparable profiles. Raw-material supply is arranged separately.
Can you help us qualify our product to a standard?
The line can be configured for profiles meant to meet EN 13706 or bars meant to meet ASTM D7957 or CSA S807. Qualification testing is done by an accredited lab and remains the producer's responsibility.
How long from order to first production?
It depends on the number of dies, line count and your site readiness. The quotation states lead time in working days for manufacture; installation dates are set once the site is ready.

Next step

Tell us the profiles and output. Get a line configuration and layout.

Quotations state the manufacturer, the exporter of record, the warranty party, FAT scope and payment milestones. No figure is quoted without a drawing.